Havelock st, Hartlepool

Project: Planing, Re-surfacing & Buff laying in Hartlepool

Duration: 2 Days


Value: £16k


Key Works: Planing Re-surfacing, Buff laying


The works saw us lay 10mm buff material at an average depth of 40mm to an area of approximately 230m2.


Before the material could be laid, the area required all debris and loose material to be completely removed. We did this with one of our own mechanical sweepers, before a tack coat was sprayed on and left to cure for a total of 30 minutes.


The works required approximately 20t of buff material, which was laid on the first day.